屋面防水工程的施工要点
屋面防水工程的施工要点
Key points of roof waterproof construction
①、出屋面管道补孔工作应在做屋面防水层前完成,包括穿层管补孔。并由专人负责,不得由管道工补孔,以确保修补质量。凿除预留四壁松动浮石,清除垃圾,底模必须支撑牢固,以保证补漏浆,不下坠。
① . the hole filling work of the pipe out of the roof shall be completed before the roof waterproof layer is made, including the hole filling of the pipe through the layer. It shall be in the charge of a specially assigned person and shall not be mended by a plumber to ensure the repair quality. Chisel away the loose pumice on the reserved four walls and remove the garbage. The bottom formwork must be firmly supported to ensure the leakage and no falling.
②、提前洒水湿润后,浇20㎜1:2水泥浆接浆,上浇C20加微膨胀剂细石砼,并要求浇筑密实。
② After watering and wetting in advance, pour 20 mm 1:2 cement mortar for mortar connection, and pour C20 plus micro expansion agent fine stone concrete, and the pouring shall be dense.
③、隔天在其表面上用防水油膏嵌缝,然后用1:2水泥砂浆与屋面找平,并在管道周边做“馒头”,在“馒头”与管道之间宜填嵌密封材料再做防水处理。
③ The next day, the surface of the pipe shall be caulked with waterproof ointment, and then leveled with the roof with 1:2 cement mortar, and "steamed bread" shall be made around the pipe, and the sealing material between the "steamed bread" and the pipe shall be filled before the waterproof treatment.